100MW/200MWh Lithium Iron Phosphate Energy Storage Project in Zhejiang, China
The project is the largest energy storage power station in Lishui City, Zhejiang Province. As the first pioneering project to combine semi-solid state batteries with energy storage system, Kehua adopted four 1.25MW high-performance energy storage converters, which were connected in parallel to a single 5,000kVA transformer, achieving a 35kV AC grid-connected output. By adopting the function of four energy storage converters in parallel, in the centralized energy storage technology path, combined with the charging and discharging characteristics of semi-solid batteries, the charging and discharging strategy is automatically adjusted to achieve intelligent management, which greatly improves the overall safety and operational stability of the system.